Pre-Install Checklist for an EV Charger

A checklist to run through before you buy a charger or sign an installation contract.

0 / 15 completed

Know your needs

Panel and wiring

Paperwork

Contractor

Equipment

Use this checklist before you buy equipment or sign anything. It is organized by stage so you can work through it over a few days. Tick items as you finish them; your progress is saved in your browser only.

The goal is to remove surprises. Most cost overruns on EV charger jobs come from three sources: a panel that turned out to be full, a longer cable route than anyone measured, and a permit or utility step that nobody started early. Each group below targets one of those risks. If you cannot check an item, that is not a failure. It is a question to put to your electrician or utility.

For context on each item, see our guides on how the install works, permits and documents and common mistakes. The checklist is general guidance and does not replace a licensed electrician's assessment or your local code.

Related guides

Getting Started and Installation

EV Charger Permit Requirements and Documents You Need

What permits, inspections and paperwork an EV charger installation usually requires in the U.S., who pulls them, and which documents to gather for utilities, HOAs and rebates.

5 min read